Service
Sub-Floor & Joist Replacement.
A floor you can't feel anymore.
The Work
Spongy floors, sloping rooms, and termite-eaten or rot-compromised joists are our specialty. Depending on damage extent we sister joists, splice rotted ends, or fully replace structural members to current code. Sub-floor decking is replaced with the right grade and thickness for the finish floor going back over it.
Method · 5 steps
- 01
Open finish floor and assess every joist + the sill plate.
- 02
Sister, splice, or replace structural members per current code.
- 03
Re-deck with appropriate sub-floor (3/4 T&G plywood standard).
- 04
Tie new framing into existing — squared, level, fully nailed.
- 05
Restore finish floor (tile, hardwood, vinyl, carpet) to match.
Frequently asked
Do you have to remove the whole floor?
+
Usually no. We pull just enough to access compromised framing. On extensive damage we sometimes re-deck a whole room, but we always quote the smallest viable scope first.
What about the existing flooring?
+
If it's tile or hardwood we save what we can and reinstall to match. If it's older carpet/vinyl we typically replace, since reusing it rarely looks right.
Inquiry
Send the termite report.
Quote within forty-eight hours.
Email, text, or upload the PDF — even a phone photo of each page works. David reads every report personally.
Shop address
1052 Camino Ciego
Vista, CA 92084
What you get back
- · Line-by-line written estimate
- · Clear scope · no lump sums
- · Schedule that plans around escrow
- · Re-inspection coordinated for you